HYBACS – Tubli WPCC Bahrain

Award-winning HYBACS Upgrade at Tubli WPCC, Bahrain


Project Name: Tubli WPCC (Phase 1)
Client: Ministry of Works (MoW), Bahrain
Capacity: 100 MLD/500,000 P/E
Project Value: £14.7m
Main Contractor: Bluewater Bio

Project Overview

tubli-before-after

The existing activated sludge plant at Tubli Water Pollution Control Centre (WPCC) was designed to treat a daily flow rate of 200,000m³/d. However, due to the continuing rapid growth of Bahrain, the present flow rate into the works was in excess of 300,000m³/d and this is only expected to increase in the future.

The Bluewater Bio solution, based on its proprietary HYBACS® secondary treatment process, comprised of the conversion of 2 of the 10 aeration lanes and 4 of the 12 clarifiers into a HYBACS plant, by installing 42 SMART™ units upstream of the aeration lanes. The upgraded HYBACS plant treats 100,000m³/d meaning that the two aeration lanes, originally designed for 40,000 m³/d, now have a 150% uplift in capacity.

Project Highlights

tubli-flow-700pxh

Project Gallery

cta-projects-hybacs

HYBACS VIDEOS

For more videos click HERE

Contact Us:
Tubli Sludge Settlement Video

For more videos click HERE

Latest BwB News

Wastewater firm’s global clean sweep (Daily Express)

Article by Maisha Frost, Daily Express, 14 August 2019 [Click image to enlarge]  

August 15, 2019
Bluewater Bio Awarded Three Consecutive Phosphorus Removal Contracts

Bluewater Bio Limited, a leading provider of treatment solutions to the water industry, is pleased to announce that its high rate multi-media filtration technology, FilterClear, has been selected for three further plants by three different Water Companies in order to

Read more ›

April 12, 2019

Latest BwB Visual Media

BwB corporate video

Watch our corporate video

March 14, 2014
HYBACS at Tubli WPCC, Bahrain

The largest upgrade of its kind in the Middle East

Read more ›

March 13, 2014