ERWAT shares new thoughts on wastewater (IMIESA)

Tumelo Gopane, Managing Director, ERWAT

 IMIESA spoke to Tumelo Gopane, managing director, East Rand Water Care Company (ERWAT), about the company’s future strategy and its pivotal role in changing the landscape of wastewater treatment in South Africa.

Home to more than 3.5 million residents, the City of Ekurhuleni is Gauteng’s third largest metro and a strategically important one, with its economy largely driven by agriculture, manufacturing and mining. Ekurhuleni’s approved Aerotropolis Master Plan is also strategically important, driving the vision of becoming an Aerotropolis City.

ERWAT Projects

Within its own organisation, ERWAT has embarked on various upgrade initiatives, as well as longer-term plans to rationalise its treatment plants down from the current 19 to around 9… “In the meantime, Tsakane is currently being commissioned and features the use of Bluewater Bio’s proprietary HYBACS activated sludge process, supplied and supported locally by Headstream Water. ERWAT reports that the Hybacs ‘plug-and-play’ system is running optimally, using 60% of the electricity for the same quantity of wastewater and a third of the physical footprint.”

This article is an extract taken from an interview with Tumelo Gopane, Managing Director, ERWAT, which appeared in IMIESA Magazine in May 2018. To read the full article click here

Latest BwB News

Bluewater Bio obtains Achilles UVDB Category C Verify 2018-2019 Accreditation.

Bluewater Bio are pleased to announce they have obtained Achilles UVDB Category C Verify 2018-2019 accreditation, with an aggregate score of over 98% across all assessed criteria. The Company obtained a perfect score across most of the criteria assessed resulting

Read more ›

October 26, 2018
Bluewater Bio awarded contract for HYBACS® Upgrade at Jubail Industrial City, Saudi Arabia

Bluewater Bio Limited, a leading provider of treatment solutions to the water industry, is pleased to announce that Saudi-based private utility company Marafiq has selected Bluewater Bio’s hybrid activated sludge process, HYBACS®, to upgrade its Industrial Wastewater Treatment Plant (“IWTP-8”)

Read more ›

July 2, 2018

Latest BwB Visual Media

BwB corporate video

Watch our corporate video

March 14, 2014
HYBACS at Tubli WPCC, Bahrain

The largest upgrade of its kind in the Middle East

Read more ›

March 13, 2014